| 1. We will deliver your pool to your home with the pool ready to be installed. |
 |
| 2. We will lay the pool out in your yard where you want it to be installed. |
 |
| 3. The same day we will dig the hole, checking elevation and matching it to the pool you chose. |
 |
| 4. After digging is complete, we will place the bed of masonry sand on the floor of the pool. |
 |
| 5. Next, we will place the pool in its location making certain that the pool is level. If it is not, we will lift the pool out and re-groom the leveling sand until it meets industry standards. |

 |
| 6. After pool is set, we begin backfilling with masonry sand using water to compact the sand at the same time we fill the pool with water. |
 |
| 7. After pool is filled with water and backfilled, plumbing will begin with all necessary equipment put in place for the function of your pool. |
 |
| 8. Once plumbing is completed and pool is running, the forming of the concrete deck around the pool will begin. |
 |
| 9. Next step is the pouring of the concrete. |

 |
| 10. Last, the job is now complete with the concrete down and pool cleaned. All in 14 days or less. |
 |
|
11. Of course there are certain circumstances that are outside of our control that may prolong the installation process. Some examples are:
- Permit delays
- Inclement weather
- Poor soil conditions
- Delayed inspection schedules
|